Sunday School: 9:30 AM

Worship: 11:00 AM

Prayer: Sunday 9:00 AM and Tuesday 1:00 PM

“Faith In Action”: Ministry Capacity Expansion

LRPC-Building-Addition_Plans_Elevation-Front-From-Driveway

LRPC-Building-Addition_Plans_Elevation-Main-Entrance

LRPC-Building-Addition_Plans_Elevation-Rear-Side

LRPC-Building-Addition_Plans_First-Floor

LRPC-Building-Addition_Plans_First-Floor-2

LRPC-Building-Addition_Plans_Basement

*This is the existing church building basement — only to show you where the ‘lift’ will end up on the lower level. The classroom will be walled off and a new door will be installed. Otherwise, nothing changes to the existing basement.

2 Responses to "“Faith In Action”: Ministry Capacity Expansion"

  1. Patti Palmisano Posted on January 8, 2016 at 2:16 PM

    The classroom in red next to the offices–is that an addition classroom to the 3 original proposed classrooms in blue? What was that space originally allocated for?

    Is there a handicap accessible ramp coming up from the right to get to the new front entrance (which appears to have several steps)? And if so, does that mean there will be 2 sidewalks coming from the driveway for both step-users and ramp-users?

    • LRPCAdmin Posted on January 9, 2016 at 11:11 AM

      That red area had been for an elevator. Since we’re putting a lift in the existing Lobby, that red area is now slated to be a classroom.

      Yes, there’s handicap accessible access into the building as well as stairs.

Leave a Reply to Patti Palmisano Cancel reply